Biogas, Sewage Gas & Landfill Gas Generators

Loadside Power quotes gas-engine generator and CHP packages for anaerobic digestion, wastewater treatment and landfill gas projects. Send your gas source, measured flow, methane content and electrical requirement. We assess the equipment around the gas your site can supply, the intended operating duty and any heat-recovery requirement.

Request a Biogas Equipment Quote

Biogas CHP Output Ranges

The figures below are catalogue ratings for selected biogas CHP configurations. Each rating is nominal electrical output per module. The ranges cover discrete equipment sizes.

Compact biogas CHP module — 50 kWe.

Mid-size biogas CHP configurations — 80–500 kWe.

Larger biogas CHP configurations — 551–2,547 kWe.

For sewage gas and landfill gas, request a rating based on measured fuel conditions and the specified treatment. For electricity-only generation, ask for the applicable rating and cooling scope. For CHP, specify where the heat will be used and the required delivery temperature or pressure.

Start with the Gas Available to the Engine

Provide minimum and typical usable gas flow in Nm³/h, with measurement reference conditions if known. Share methane concentration, gas pressure and any available analysis for hydrogen sulphide, moisture and siloxanes. Identify existing treatment and explain how gas supply varies across the operating period.

Anaerobic digester. Share the gas production profile, available storage, current gas uses and digester heat demand.

Wastewater treatment plant. Share sewage-gas flow, existing treatment equipment and any contaminant analysis.

Landfill. Share recent flow and methane records, collection-system operation and the expected trend in usable gas.

If you have several readings, pair flow and composition for the same period where possible. Include the sampling date and location and whether the sample was taken before or after treatment. If the laboratory reports methane on a wet or dry basis, include that information. A credible low-flow reading helps assess what the plant can sustain during regular operation.

Define Gas Quality at the Engine Inlet

Ask the supplier to specify the acceptable fuel composition, inlet pressure and contaminant limits for the proposed equipment. Identify any gas cooling, condensate removal, filtration or other treatment required to meet those limits. If the treatment system is a separate package, compare its expected outlet conditions with the engine inlet specification.

The offer should identify who supplies treatment controls, gas monitoring and the interfaces with the generator package. For an existing plant, list the treatment equipment you intend to retain and provide recent gas analysis after treatment if available.

Compare Gross Output and Net Power

Ask where the quoted electrical power is measured. Gas blowers, cooling and treatment equipment can draw some of the generated power. Have each supplier identify which auxiliary loads it has deducted and the fuel flow and methane basis used for its rating. Compare the power available at the same electrical connection point.

If the gas supply varies, ask how the engine would operate when flow or methane content falls. Have the supplier describe the applicable operating range and the basis for the proposed rating. For CHP, ask for the usable heat at your process conditions and provide the hours when the site can use it.

Define Package Scope and Delivery

Specify whether the enquiry covers the engine-generator set, enclosure, controls, cooling, electrical connection, gas treatment and heat recovery. On a replacement or repowering project, include the current engine model, running hours and connection points you want to reuse. Check the written offer for exclusions, the delivery point, commissioning responsibility and fuel conditions that apply to warranty support.

Explore Gas Engine Replacement and Repowering · Review Wastewater and Landfill Gas Project Requirements

What to Send for a Biogas Equipment Quote

Start with your company, project country, gas source, minimum and typical flow, methane content and target electrical output. State whether you need electricity only or CHP. Attach available gas analysis and include voltage, frequency, expected operating hours, existing gas treatment and the delivery date or tender deadline.

Questions Buyers Ask

Can I enquire while a gas analysis is pending?

Yes. Share available site and operating information. A current analysis may be needed before the proposed unit and its performance can be confirmed.

Can I use my existing gas-treatment system?

Share its scope and recent outlet readings so the supplier can compare its performance with the proposed engine’s inlet requirements.

Can I discuss a landfill site before selecting a generator?

Yes. If the decision concerns gas rights, a power purchase agreement or repowering, start with a project review.

Explore Landfill Gas-to-Energy Project Development

Request a Biogas Equipment Quote · Email Loadside Power