Industrial CHP & Cogeneration Equipment
Loadside Power quotes industrial gas-engine combined heat and power equipment for facilities that need electricity and can use recovered heat. The CHP portfolio spans 20 to 4,500 kWe of nominal electrical output per module, depending on fuel and configuration. We assess the package around your electrical load, useful heat demand, existing utilities and delivery location.
Request an Industrial CHP Quote
Natural Gas CHP Output Examples
The following catalogue figures show the nominal electrical and thermal output of selected natural gas CHP configurations.
Compact CHP module — 20 kWe electrical output and 44 kWth thermal output.
Mid-size CHP module — 250 kWe electrical output and 315 kWth thermal output.
Industrial CHP module — 1,067 kWe electrical output and 1,146 kWth thermal output.
Larger industrial CHP module — 2,028 kWe electrical output and 2,174 kWth thermal output.
The quotation identifies the proposed module, fuel basis, electrical output at site conditions and the heat available at your process connection. For digester gas, sewage gas or landfill gas, start with the Biogas CHP Equipment page.
Match CHP Output to the Hours Your Plant Uses Heat
A food plant may use recovered hot water for washdown or process heating. A factory may be able to use recovered heat to preheat boiler feedwater. Share the electrical load and the hours when the process can take heat. A typical weekday and weekend load profile helps identify when the site can use both outputs.
If electrical demand continues during a shutdown or a change in production schedule, describe what happens to heat demand in those periods. Ask the supplier how the engine would operate at lower heat demand and which cooling or heat-rejection equipment is included. For sites seeking electrical power only, see Industrial Natural Gas Engine Generators.
Specify Hot Water or Steam at the Process Connection
Hot water. Provide supply and return temperatures, flow or estimated heat demand, and the operating schedule. If an existing boiler will stay in service, share its duty and the point where the CHP heat-recovery system would connect.
Steam. Provide the required steam pressure, consumption and operating hours. Identify any existing boiler, feedwater system or steam header the package would connect to. Where the plant needs both steam and hot water, identify the processes served and when each runs.
Ask for the proposed heat streams and their delivery conditions to be listed separately. This gives your site team a basis to check whether the heat can be used and what equipment is needed at each connection.
Compare CHP Offers at the Same Operating Point
Compare net electrical output and available heat at the same engine load, fuel basis and site conditions. If the engine will often run below full load, request performance figures at a representative part-load point. Ask which auxiliary loads are included in the net electrical figure.
For a multi-module project, share the lowest expected plant demand and any capacity that must remain available during maintenance. That information helps determine how many modules would run at low demand and how the plant would operate with a unit out of service.
Confirm the Equipment and Delivery Scope
Check whether the offer includes the engine, alternator, controls, cooling, heat exchangers, exhaust heat recovery, enclosure and switchgear. Ask the supplier to identify electrical and thermal connection points, equipment exclusions and delivery milestones. Confirm responsibility for installation, commissioning and warranty support in the written offer.
For a retrofit, identify what you plan to retain. Boiler equipment, building services, gas supply and existing switchgear may set constraints on the proposed package. Share available drawings and the shutdown window early if they affect the quotation.
What to Send for a CHP Quote
Start with your company, project country, fuel, approximate electrical load, intended heat use and target delivery date. Include the information you already have.
Electrical supply — Load profile, voltage, frequency, operating hours and grid connection mode.
Useful heat — Hot-water supply and return temperatures, or steam pressure and demand.
Fuel and existing plant — Gas specification, supply pressure, boiler details and equipment to retain.
Procurement — Tender deadline, installation window, available space and scope already assigned to the site contractor.
Questions Buyers Ask
Can I enquire before completing a heat study?
Yes. Describe the process, the hours it operates and any temperature or pressure information you have. Estimates are sufficient for an initial discussion.
Can I add CHP to an operating factory?
Yes. Share the existing boiler or heat system, electrical connection, available space and installation window. For a replacement, include the interfaces and equipment you plan to retain.
Can I request a multi-module CHP package?
Yes. Include total electrical and thermal demand, minimum site load and the electrical capacity you need available during maintenance.