Wastewater & Landfill Gas-to-Power Projects

Loadside Power helps wastewater operators, landfill owners and project developers assess whether recovered gas can support on-site power generation or combined heat and power. We start with the available gas, the intended use of electricity and the decision facing the site. That decision may be a new installation, replacement of an existing engine or a plan to use gas that is currently flared.

Discuss a Gas-to-Power Project

What Makes a Gas-to-Power Project Ready?

Gas supply. Establish measured flow, methane concentration, operating variability and the expected gas production trend. Identify which measurements are available and when they were taken.

Gas and site control. Identify the operator, gas-use rights, site access and ownership of existing equipment.

Electricity use. Confirm how much power can be used on site, whether grid export is being considered and whether an offtake agreement is already in place.

Equipment to retain. List existing gas collection, treatment, switchgear and generation equipment. Note its condition and available capacity.

Next decision. Identify whether the site needs an initial feasibility review, an equipment quotation, a replacement decision or preparation for a tender.

Wastewater Treatment Plants

Start with the digester gas available for generation after existing uses. Check whether the treatment plant can use the electricity on site and whether recovered heat can serve the digesters or another plant load. If an engine is already installed, share its output, running hours and the treatment equipment you plan to retain.

Landfill Gas Projects

Use recent gas collection and quality records to assess how much fuel the site could sustain. Explain whether the gas is currently flared, used in an operating engine or committed under an existing arrangement. For a site facing a gas-rights, power purchase agreement or repowering decision, start with the Landfill Gas-to-Energy Project Development page.

Share the Site and the Decision

Send your site location, role in the project, gas source, available measurements and the next decision you need to make. Include the operating equipment and any known tender or shutdown date. If your fuel data and equipment requirement are ready, use the product page to prepare a quotation enquiry.