Industrial Natural Gas Engine Generators

Loadside Power quotes natural gas engine generator sets for industrial on-site power, plant expansion and replacement projects. We assess single-generator and multi-unit packages around your required electrical output, operating duty, gas supply and delivery location. An approximate site load and operating schedule are enough to start a project-specific quotation enquiry.

Request a Natural Gas Generator Quote

Generator Output and Operating Duty

Selected peak-load generator packages start at 500 kWe of nominal electrical output. Continuous, prime and emergency standby output is confirmed for the proposed unit and duty. The quotation should identify the applicable operating limits and the output available under site conditions.

Continuous industrial power. Specify sustained electrical load, annual operating hours and available gas supply.

Prime power. Provide minimum, normal and peak demand, expected load variation and planned operating hours.

Peak shaving. State peak duration, required starts, grid-parallel operating conditions and target output.

Emergency standby. Identify essential loads, required start time, largest load step and transfer scheme.

Replacement or expansion. List existing units, switchgear and controls. Include available space and the planned shutdown window.

One Generator or Several Units?

A 2 MW site requirement can be assessed as a single-unit or multi-unit project. If production needs to continue during scheduled maintenance, state what load must still be served with one unit unavailable. If demand varies across shifts, provide the lowest expected load as well as the peak. These inputs help determine how many units would run at each operating point.

Include any large motors or loads that come on suddenly. For a multi-unit package, ask for synchronisation, load sharing and controls to be identified in the offer. For a replacement project, share the existing nameplate, voltage and controls and list the equipment you intend to retain.

Explore Gas Engine Replacement and Repowering

Compare Output at the Same Electrical Connection Point

Ask whether output is measured at the generator terminals or at the plant connection point. Cooling, ventilation and other auxiliaries can reduce the electrical power available to the site. Compare offers at the same duty, voltage, frequency, altitude and ambient temperature, with any site derating and auxiliary loads stated.

If the equipment will often run below full load, request fuel consumption at representative operating points. Check the assumed gas pressure and heating-value basis so the figures can be compared. For grid-parallel or island operation, have the relevant supplier and site engineer confirm the electrical interface, protection and control requirements.

Define What the Quotation Includes

The gas engine, alternator, controls and cooling arrangement are the starting point. Specify whether you also need an enclosure, gas train, exhaust system, switchgear or synchronisation equipment. A clear scope and exclusions list helps your site team identify the electrical, mechanical and civil work it needs to arrange.

For an active purchase, ask for the proposed equipment data sheet and a general arrangement drawing to check footprint and access. If factory acceptance testing is required, state what tests and records are needed. Specify the destination and expected delivery milestone. Ask for transport, installation, commissioning and warranty responsibilities to be listed separately.

Electricity Only or Combined Heat and Power?

If the site’s requirement is electrical power, request an electricity-only package. If the plant also has a regular need for hot water, steam or process heat, include that demand and the hours when it overlaps with electricity use. The equipment can then be assessed for CHP with the heat-recovery scope clearly stated.

Explore Industrial CHP and Cogeneration Equipment · Explore Industrial Captive Power

What to Send for a Generator Quote

Start with your company, project country, approximate electrical requirement, fuel, operating duty and target delivery date. Include the details you already have.

  • Electrical — Total plant output, voltage, frequency, grid-parallel or island operation, and any essential loads.

  • Fuel and site — Available gas specification and pressure, altitude, temperature and project emissions requirements if known.

  • Package — Indoor or containerised preference, existing switchgear and scope already assigned to the site contractor.

  • Procurement — Budget enquiry, active purchase or tender, with any decision deadline or planned outage date.

Questions Buyers Ask

Can I enquire before the individual unit size is fixed?

Yes. A total site load or an estimated power range is enough to begin. Include any requirement to maintain output while a unit is being serviced.

Can I retain my existing switchgear?

Include the switchgear rating, drawings and protection details if available. Compatibility and any required modifications can then be assessed against the proposed package.

Can delivery, installation and commissioning be priced separately?

Yes. State which items you want quoted separately and which are already covered by your site contractor. Check who is responsible for each item in the written offer.

Request a Natural Gas Generator Quote · Email Loadside Power